Pipework system cleaning

Pre-commission cleaning is the process of bringing a closed heating or cooling system to a satisfactory state for commissioning, in line with the current guidance of BISRA BG 292021.

The process consists of dynamic flushing (flushing velocities and chemical cleaning to suit the system requirement), and post flushing (flushing velocities and backflushing of terminal units). Systems are then dosed with corrosion inhibitor and biocide to suit the system re-equipment. This may be molybdate, a molybdate/nitrite blend, or a tannin-based oxygen scavenger (for MTHW and HTHW systems).

Cleaning of New and Existing Pipework
Are you compliant?

At Rock Compliance, our team of highly experienced and qualified engineers ensures that the pre-commissioning cleaning of pipework systems is carried out to comply with the latest Building Regulations and BSRIA Codes of Practice standards. This process includes working to BG29 2021 Pre-Commission Cleaning of Pipework Systems – Amended 6th edition.

All our engineers carry a complete set of the latest pre-commissioning cleaning equipment, so we are fully equipped for any task.

Customer Case Studies brochure

Customer Case Studies icon Customer Case Studies

Download our case study booklet to learn more about our many successful compliance projects throughout the UK

DOWNLOAD    Download icon

CAN WE TALK?

Whether it is an issue of compliance, an investment decision, or if you are just not sure whether your existing provider is giving you what you need, please contact us.

We will be happy to give you advice on how to create low risk, compliant air hygiene systems, ensuring spend is minimised and predictable.

    scroll top icon